.HOME.CONTACT US
Loading Image...
 
PUBLICATION

Development of Technical Guidelines for Electrical and Electronic Waste Inventory
Post Date: 20 Sep 2007 
 

 

This project is conducted by BCRC-SEA and financed through the Basel Convention Trust Fund. The specific objective of this project is to develop methodological guidelines as well as to provide information to the Parties in the Region in designing and implementing a national e-waste inventory program. Geographical scope is South-East Asian countries. Cooperating Agencies are BCRC-SEA, SBC, National Focal Points and other stakeholders. Period of Implementation is August - December 2006.


Development of Technical Guidelines for 3 R (Reduce, Reuse, Recycle) of End-of-Life Electrical and Electronic Products
Post Date: 31 Aug 2007 
 

 

This project is conducted by BCRC-SEA and financed through the Basel Convention Trust Fund. The specific objective of this project is to develop methodological guidelines as well as to provide information to the Parties in the Region in designing and implementing 3R of end-of-life e-products program. Geographical scope is South-East Asian countries. Cooperating Agencies are BCRC-SEA, SBC, National Focal Points and other stakeholders. Period of Implementation is August – December 2006.


National Inventories of Hazardous Waste Demonstration Project in Philippines
Post Date: 29 Dec 2006 
 

 



Pilot Study on Transboundary Movement of End-of-Life Mobile Phones in East Asian Countries (DOWA Project)
Post Date: 28 Dec 2006 
 

 

The Cooperating Agencies of this project are BCRC-SEA, SBC/UNEP and DOWA ECO-SYSTEM CO., LTD., Relevant governments and / or ministries of Thailand, Malaysia, Singapore, Japan and other stakeholders. The overall objective of this project is to establish the actual scheme of environmentally sound management of e-wastes, especially for end-of-life mobile phones. To achieve the overall objectives, the following activities will be undertaken: (a) Investigation of the current state of end-of-life mobile phones and e-waste in the following South-East Asian countries: Thailand, Malaysia and Singapore. (b) Establishment and implementation of the pilot scheme for the collection and transboundary movement of end-of-life mobile phone between Thailand, Malaysia, Singapore, and Japan. Period of Implementation is December 2006 - March 2007


Translation of Basel Convention Technical Guidelines on the Full and Partial Dismantling of Ships (UNEP/CHW.6/23, annex) into Urdu
Post Date: 28 Dec 2006 
 


BCRC-SEA assists the SBC (UNEP/SBC) to translate this document into Urdu, as one of the activities under the Project for the Implementation of the Technical Guidelines for the Environmentally Sound Management of the Full and Partial Dismantling of Ships, being implemented by UNEP/SBC. Period of Implementation is October - December 2006


Website Upgrading, Re-development & Maintenance
Post Date: 28 Dec 2006 
 


The project is conducted by BCRC-SEA and financed through the Basel Convention Trust Fund. The general objective of the project is to fulfil the core functions of the BCRC-SEA as information centre in the implementation of the Basel Convention as well as to generate public awareness raising. Cooperating Agencies are BCRC-SEA, SBC, National Focal Points and other stakeholders. Period of Implementation is July 2006 - June 2010


user(s) online : 1 . visitor(s) today: 0 . hit: 374482
Copyright 2006 BCRC South-East Asia. Developed by CBN. All rights reserved.